Capability Statements for Software Companies: What to Include and How Buyers Use Them
What a federal capability statement is, what contracting officers look for on it, and how a software company writes one that matches its registration.
Guides for technology companies entering the federal market.
What a federal capability statement is, what contracting officers look for on it, and how a software company writes one that matches its registration.
Which NAICS codes fit a software or SaaS company, why each solicitation's code (not your own list) sets size eligibility, and how to check what buyers use.
How federal buyers weigh past performance, why no record scores neutral, and how a software company builds one from commercial work and subcontracts.
How software companies read a federal RFP, what Sections L and M ask for, and how to build a compliant proposal around the evaluation criteria.
What sources sought notices and RFIs are, why agencies post them, and how a software company answers one so the later requirement fits what it sells.
How software companies enter federal work as a subcontractor, reseller or teaming partner, what the agreements cover, and the rules that shape each role.
What Section 508 requires of software sold to federal agencies, what a VPAT and an Accessibility Conformance Report are, and how to write one buyers trust.
Phase I is in force, Phase II is suspended — not cancelled — per memo 26-P-1023. What that means for ISVs selling into DoW programs in 2026.
FedRAMP 20x opened Class A on August 3, 2026 and Class B and C on August 31. Why the prepared first cohort sets the benchmark latecomers are graded against.
The 100-point Federal Readiness Score: 12 categories, five tiers, computed from public federal data, with your own intake answers labelled self-reported.
Self-attested compliance is not verified compliance. The three states of a federal compliance claim, and why a SOC 2 Type II does not carry over.
CMMC Phase I is in force, Phase II is suspended — not cancelled — and DFARS 252.204-7012 remains in force. The DoW compliance calendar for ISVs.
Your readiness score read backward: sequence 90 days by leverage, fix the gating registration gaps first, then aim the final 30 at your FedRAMP 20x submission.
The six public federal APIs behind a readiness score — SAM.gov, USASpending, FPDS, FedRAMP, GSA CALC+, SBIR — what each informs and how a gap is shown.
FedRAMP 20x Class A opened August 3, 2026. Ready is not a checkbox: what federal buyers actually verify, and why self-attested compliance is not verified.
The Class B and C FedRAMP 20x pipelines opened August 31, 2026. What a company deciding now should do with the precedent already set.
Your SOC 2 is real federal credit — but not a complete authorization. What carries over, what doesn't, and the plan to bridge the gap before you submit.
Federal buyers distinguish three tiers of compliance: unverified assertions, self-attestation, and independent verification. Know which survives diligence.
How federal contract vehicles work for software companies: IDIQ structure, GWACs, SEWP, GSA Schedule BPAs, and how to pick a first route in.
How SBIR and STTR work for software companies: eligibility, the three phases, why Phase III matters, and how SBIR data rights protect your product.
How OTs work for software companies: the prototype conditions, why follow-on production matters, how consortia and CSOs work, and what an OT does not remove.
How federal set-asides work for software companies, what each SBA program requires, where venture-backed firms stop qualifying, and which status to pursue.
What a software company needs before SAM.gov registration, the order the steps happen in, which NAICS codes fit software, and the mistakes that cost weeks.
The FedRAMP 20x Class A pipeline opens August 3, 2026. Who qualifies, the 7 required KSIs, the SOC 2 fast path, and the 2-year clock — from primary sources.
Use USASpending.gov, SAM.gov, and NAICS codes to size your real federal TAM — not the $100B headline number, but the actual spend in your product category.
FedRAMP 20x replaces the old 12-24 month authorization process with machine-readable packages. Here's what SaaS companies need to know before Phase 3 opens.
GSA MAS is the most common federal entry point for SaaS companies. Eligibility, timeline, cost, and whether it's right for your stage — the honest breakdown.
A practical guide for ISVs entering the U.S. federal market — SAM.gov, compliance, contract vehicles, TAM sizing, and a 90-day action plan.